Projects That Define
Excellence
With over 25 years of experience and thousands of successful lifts, we've built a reputation for reliability, safety, and precision across Wisconsin and Illinois.
Featured Projects
A showcase of our recent work demonstrating our capabilities across various industries
Commercial Steel Beam Installation
40-ton lift for new office complex in Milwaukee
Residential Truss Placement
Precision placement of roof trusses for luxury homes
Industrial Equipment Installation
HVAC system installation at manufacturing facility
Emergency Storm Response
24/7 emergency crane services for storm damage
Precast Panel Installation
Efficient installation of precast concrete panels
Project Categories
We provide crane services across a wide range of industries and project types
500+ Projects
- Custom home roof truss installations
- Modular home placements
- Pool and spa installations
- Residential steel beam placement
200+ Projects
- Multi-story office buildings
- Retail center construction
- Hotel and hospitality projects
- Educational facility builds
150+ Projects
- Manufacturing equipment installation
- Industrial HVAC systems
- Production line machinery
- Warehouse racking systems
100+ Responses
- Storm damage recovery
- Equipment failure response
- Accident scene assistance
- Critical infrastructure repair
75+ Projects
- Bridge construction components
- Wind turbine assembly
- Art installation placement
- Historic building renovation
1000+ Deliveries
- Precast concrete placement
- Steel delivery and positioning
- Roofing material lifts
- Building supply distribution
Recent Project Highlights
Placed 45 structural steel beams ranging from 20 to 35 tons for a new 12-story office building in downtown Milwaukee.
Challenges:
- • Limited street access
- • High wind conditions
- • Tight timeline
Result:
Completed 2 days ahead of schedule with zero incidents
Assisted in the assembly and installation of 15 wind turbines, lifting nacelles and blade components up to 300 feet.
Challenges:
- • Remote location
- • Extreme height requirements
- • Weather-dependent schedule
Result:
Successfully installed all turbines within the planned timeframe
Responded to an emergency call for bridge beam replacement after storm damage on I-94.
Challenges:
- • 24/7 operation required
- • Traffic management
- • Safety-critical timeline
Result:
Bridge reopened 18 hours ahead of state deadline
Ready to Add Your Project to Our Success Stories?
Join hundreds of satisfied clients who trust Knoll Crane for their lifting needs.